Is the project ready to connect the model, programme and cost plan?
Work through the controls that make 4D sequencing and 5D cost planning useful. You will get a practical list of gaps and the smallest sensible pilot to run.
Free project-planning tool · no account
What are you preparing?
Choose a route, rate each control and use the result to plan the smallest sensible pilot.
01
Intended use
Start with the project decision, not the software.
0/302
Programme coding
A model cannot link reliably to activities that have no stable identity.
0/303
Model breakdown
The model needs to be grouped in the same language as delivery.
0/304
Quantity basis
A quantity becomes useful when everyone agrees how it is measured.
0/305
Cost structure
Model quantities and commercial cost lines need a deliberate mapping.
0/306
Change control
Controlled reference versions let the team explain what changed.
0/307
Responsibility
Named people need to prepare, check and approve every source.
0/308
Validation
A representative test finds mismatched codes before they affect the whole project.
0/309
Update cadence
The model, programme and cost information need a repeatable update rhythm.
0/3
Start with control, not software
A moving model is not yet a dependable plan.
For 4D, activity codes and model zones need to meet. For 5D, measured quantities and cost codes need the same discipline. The checklist keeps those controls visible.
Have the current programme, a representative model, the cost breakdown and the responsibility route nearby. Missing information becomes part of the action list.
Send the readiness plan with the current programme, representative model and cost structure. We will confirm the source review and first useful package.