Editable BIM project controls
Download the tracker you need.
Choose a blank workbook to start clean, or open a worked example to see how the fields connect. No email gate.
Version 1.0 · reviewed 22 August 2026
Five connected control suites.
01 · XLSX pairCreate one comparable BIM brief, normalize proposal fees and assumptions, review relevant work, test one sample package and record the appointment decision.
- Comparable BIM scope baseline
- Deliverable and acceptance schedule
- Commercial normalization across routes and currencies
- Seven-dimension proposal comparison
View fields, use and notes ↗02 · XLSX pairPlan drawings, models and other information containers; connect task-team delivery plans to milestones; and preserve a traceable transmittal record.
- Drawing, model and information container register
- MIDP/TIDP information delivery planner
- Transmittal register
- Editable controlled lists
View fields, use and notes ↗03 · XLSX pairDefine clash/check rules, record exact model versions, manage actionable coordination issues and preserve QA evidence through verification.
- Coordination check plan
- Model-version register
- Clash and issue register
- Model-health and exchange QA checks
View fields, use and notes ↗04 · XLSX pairKeep questions, responses, review cycles, decisions, linked changes, implementation and verification distinct but traceable.
- RFI and technical-query register
- Submittal and sample register
- Design and project decision log
- Linked change control
View fields, use and notes ↗05 · XLSX pairAudit family provenance, parameters, type-flex behavior, performance and release evidence before content enters a project or managed library.
- Family inventory and provenance register
- Parameter and GUID audit
- Type and geometry flex-test matrix
- Performance and complexity review
View fields, use and notes ↗ Control boundary
Project starting points—not automatic compliance.
Adapt terminology, responsibilities, status and suitability codes, acceptance routes, thresholds and reporting rules to the current project appointments, information requirements, CDE and jurisdiction.
The examples use fictional organizations, people, identifiers, dates and results. They are not ZX client records, tested native family files or industry benchmarks.