Blank project edition
Configure controlled lists, roles, dates, codes, thresholds and evidence routes before entering live records.
- No client or project data
- Macro-free editable XLSX
- Frozen working headers and configured A4 print areas
Free editable control · v1.0
Plan drawings, models and other information containers; connect task-team delivery plans to milestones; and preserve a traceable transmittal record.
Best for: BIM managers, Information managers, Document controllers, Design teams, Contractors.
Configure controlled lists, roles, dates, codes, thresholds and evidence routes before entering live records.
Use the completed rows to understand the workflow, then replace every sample entry rather than treating it as a benchmark.
Included
Questions it controls
Five-minute start
Replace sample disciplines, states, response codes and thresholds with the project’s agreed language.
Assign a responsible person, date and controlled evidence route for every live record.
Use the dashboard in a real coordination or project-control meeting; do not treat it as a passive report.
Limits
This workbook is not ISO text or certification, legal or contract advice, a safety plan, engineering approval, professional certification or a substitute for project appointments.
The worked edition is conspicuously fictional. Replace every sample value. Keep project files and linked evidence under the project’s own access and retention rules.
Related ZX service: BIM modeling + documentation ↗
Start with the deliverable
Send the project controls, delivery stage, roles, CDE, issue cadence and reporting needs. We can adapt the structure without inventing authority or acceptance rules.